Skip to main content

Cross-laminated timber UK construction has grown dramatically over the past decade, transforming how builders approach large-scale projects. This engineered wood product, created by layering boards at right angles and bonding them together, offers strength that rivals concrete and steel while bringing unique environmental benefits to the construction industry. 

Speed and Efficiency 

One of the most striking CLT benefits comes from its rapid assembly time. The Dalston Works project in London, a 121-unit residential development, went up in just 18 months – nearly half the time a traditional build would have taken. The precision-cut panels arrived ready to install, reducing both construction noise and disruption to neighbours. 

Environmental Impact 

Sustainable building materials have become crucial in fighting climate change, and CLT leads the charge. Each cubic metre of timber locks away roughly a tonne of carbon dioxide, making timber buildings act as carbon stores. The Murray Grove development in Hackney saved 310 tonnes of carbon compared to a concrete equivalent.

Strength in Layers 

Despite common misconceptions, timber construction trends show CLT’s remarkable structural capabilities. The material’s cross-layered nature creates exceptional strength and stability. Recent testing has proven its resilience to fire, with char layers forming natural protection for the structural core. 

Design Freedom 

Eco-friendly architecture doesn’t mean compromising on style. CLT’s versatility allows for striking designs that would be challenging with traditional materials. The Sky Health and Fitness Centre in West London showcases how exposed timber elements can create warm, inviting spaces while maintaining modern aesthetic appeal.

Cost Considerations 

While initial material costs might be higher than traditional options, the savings come through faster construction times, reduced foundation requirements due to lighter weight, and minimal waste on site. The Murray Grove project in London was built in 49 weeks instead of the estimated 79 weeks it would have taken if they had used concrete, which saved the company money on the build.  

Weather Resistance 

British weather poses unique challenges for construction materials. CLT panels arrive with protective coverings and can be installed in most weather conditions. Unlike steel, which requires dry conditions for welding, or concrete, which needs specific temperature ranges, CLT construction can continue through typical British drizzle.

Indoor Benefits 

Beyond structural advantages, CLT creates healthier indoor environments. The material naturally regulates humidity, reduces condensation risk, and provides excellent acoustic properties.  

Future Prospects 

The future looks bright for timber construction in Britain. Planning authorities increasingly favour sustainable materials, while architects and engineers continue finding innovative ways to use CLT.  

Industry Impact 

As more contractors gain experience with CLT, its adoption continues spreading beyond London. Training programmes in Manchester and Glasgow are creating skilled installers, while British timber producers are expanding their manufacturing capabilities to meet growing demand.

Looking Ahead 

The rise of cross-laminated timber is revolutionising UK construction, offering a sustainable, efficient, and aesthetically versatile solution for the future of building. At A9 Architecture in Essex, we are committed to integrating innovative materials like CLT into our designs, ensuring your projects are both environmentally responsible and visually stunning.

Whether you’re planning a new build, extension, or renovation, our experienced team is here to guide you through every step of the process. Contact us today for a free consultation, and let us help you explore the possibilities of CLT in creating spaces that balance sustainability with exceptional design. Together, we’ll shape a better-built environment for the future. 

Alan Green

A fully qualified Architect, Alan studied at Greenwich University where he was a nominee for the RIBA Presidents Medal and later graduating from the Architects Association, Alan has now over 20 years experience working within the construction and architectural industry.

Contact us Today!